August 31, 2008

Planned Windpark In Baras

Last Sunday, my friends and I were talking about the planned wind farm in Catanduanes. So I did some research and came up with this company called Cammon Windsolar Energy Inc., a joint venture between German and Filipino partners founded in 2003. The planned site will be located at a 3.24 hectares land in Baras. The factors for choosing Baras were:
  • Distance to the Baras main grid connection point is not far away. There are good provincial and municipal roads.

  • The Wind Farm Exploration and development is one of the most welcome investment in the Philippines. There is enough distance to the residential zone. The wind speed is between 7 – 8.8 m per second. The properties are in the average 85 % Government Owned Land.

  • There are abandoned logging roads. The terrain is rolling. The grid connection is more than sufficient for Wind Turbine Systems.
Site development map of Windpark.

0 comments:

 
Disclaimer: The information in this weblog is provided “AS IS” with no warranties, and confers no rights. This weblog does not represent the thoughts, intentions, plans or strategies of the province of Catanduanes, Philippines. It is solely my opinion. Feel free to challenge me, disagree with me, or tell me I’m completely nuts in the comments section of each blog entry, but I reserve the right to delete any comment for any reason whatsoever (abusive, profane, rude, or anonymous comments) – so keep it polite, please.

©2008 - 2011 All Rights Reserved